Control building Satellite project in Mohammed Najib base

It is backup of satellite project in hikastep and main building for control of satellite with built up area 6000 m².

Scope of work:

Redesign and supervision for all MEP systems.

Date:

(10-2017 up to date).

Work description:

Redesign and site supervision for all MEP works (for control building and layout plane) of satellite project as follow:
  • Electrical works:

    Low & medium voltage networks and schematic SLDs, Lighting, small power, cable route layouts, cable size, RMU and Transformer substation, generator calculation and design of emergency systems, power supply for Antennas and control equipment, short circuit, cable tray & load schedule layouts and calculations.
  • Telecommunication works:

    All special, control and low current systems (fire alarm, telephone, data (network for service and network for satellite operator) , CCTV, Access control and BMS )and fiber optic layout network for satellite dishes .
  • HVAC works:

    • DX system HVAC system in all rooms and corridor.
    • Cracks in all servers rooms .
  • Plumping works:

    • All water, sewage and draining works inside control building and layout .
    • Rain drainage network for layout .
  • Fire fighting works:

    Aerosol system in all operator control rooms and fire extinguishers and sprinkler system are using in other rooms.